Sunday, November 14, 2010

Well & Patio

This week we figured out how we are doing the cabinets and the placement in the kitchen. Once the order is placed we should have the cabinets by the end of December.

The major changes this week were the well being dug and this concrete patio outside of the basement.
Since the videos do not always work on the blog, I've gone back to uploading them to you tube and providing the link:
http://www.youtube.com/watch?v=ylr7CgNs76M

Sunday, November 7, 2010

Fall Changes

The deck is now in place all the way around the back.
This is the HVAC unit in the basement. There is also one in the upstairs and one in the bonus room to heat and cool the bonus room and the breezeway.
Look at all those wires! Lots of electrical work has been done and Jacob installed the camera mounts so that we will be able to keep track of the place remotely.
We now have doors!
Here is the video from October when Grandma DeNearing and Aunt Jeanette were visiting:

This is the video from Nov 6 when we got back from our travels ; Jim & Jacob to South Dakota to hunt with Luci and Linda to Eugene to play Halloween with Lisa, Holly & Luke.