Tuesday, June 28, 2011

Occupancy Permit!

Looking like home.
Jim hung his ducks and pheasant over the doors.
Outside view - No construction vehicles!
Here's the video of the finished product!

Tuesday, June 7, 2011

Starting to move in!

My long-awaited front porch swing!
Bonus room - bring your own sleeping bag!
This is a view from the back.
Cleaning and appliances installed makes all the difference!
Here's a video:

Monday, May 16, 2011

Almost Done

We now have a rug in the great room - all of the tools for construction were moved to the garage.
Look at how nice the floors cleaned up!
The posts and railings being finished sure adds a lot.
Instant lawn.

Tuesday, April 12, 2011

Getting anxious to finish!

Part of the reason that the house is taking so long is the time consuming details like these shelves beside the window in Mom's room.
Are we anxious to move in? Look at our living room in Springfield PACKED with furniture!
We now have stair railings and then the railings around the top floor overlooking the great room and kitchen - nice!
Here is a short video clip:

Saturday, March 5, 2011

Carpets & Railings

Basement carpet looks light - we will have to keep the mud out!
Bonus room carpet looks good - lots of places to hide in here!
Grading, gravel and railings have been the work of the week.

Monday, February 28, 2011

Family Pictures on the Deck



Lots of work has been done on the house - check out the floors! Lisa came in from Oregon and we arranged for Sue & John Moore to take some pictures before my hair falls out from the chemotherapy! Gotta beat back the cancer so we can party at the housewarming. They tell us 3 weeks or so til completion.

Sunday, February 13, 2011

Tubs & Tiles

This is the tile on the wine cellar side complete with wino at the other end!
Is this the cutest tub you have ever seen?

Saturday, February 5, 2011

Flooring fans

From the second floor, the bamboo flooring is in place but not yet nailed down; it is so hard that it broke the nail gun. The replacement nailer comes on Tuesday.
Fans in the great room.
Lights on the first floor walkway.

Tile in the basement
Here's today's video:

Tuesday, February 1, 2011

Trim and Bathrooms

The tile floor in "Mom's" bathroom is now done.
The master bathroom tile looks great.
This is the wall on the between the upper part of the kitchen and the great room - it used to just insulation but it now looks like logs!
Here is today's video:

Saturday, January 15, 2011

Doors, Floors and Tiles

The interior doors are being put in place and stained - good for playing "Hide and Seek!"

This is a tile that I found in Eugene, OR and had installed in the upstairs bathroom.
The floors on the second level are being sanded and then will be finished with a clear coat.

Here's today's video tour!


Sunday, December 26, 2010

Paint & Garage Doors

Garage doors are in. Will someone please roll the trash bin to the street?
The bonus room above the garage is a light blue - very pretty.
Basement room is a beige-coral color that we are hoping will go nicely with the terra cotta tiles for the floor.
One of the upstairs bedrooms is a light yellow called "morning sun" which is ironic since the room faces west!

Saturday, December 11, 2010

Drywall & Heat


Dry wall installation sure makes the inside take shape.
We have heat inside that the drywall finishers need in order to put the mud on the walls.
On the outside the stone finish is around to the front.
Here is the latest video:

Sunday, November 14, 2010

Well & Patio

This week we figured out how we are doing the cabinets and the placement in the kitchen. Once the order is placed we should have the cabinets by the end of December.

The major changes this week were the well being dug and this concrete patio outside of the basement.
Since the videos do not always work on the blog, I've gone back to uploading them to you tube and providing the link:
http://www.youtube.com/watch?v=ylr7CgNs76M

Sunday, November 7, 2010

Fall Changes

The deck is now in place all the way around the back.
This is the HVAC unit in the basement. There is also one in the upstairs and one in the bonus room to heat and cool the bonus room and the breezeway.
Look at all those wires! Lots of electrical work has been done and Jacob installed the camera mounts so that we will be able to keep track of the place remotely.
We now have doors!
Here is the video from October when Grandma DeNearing and Aunt Jeanette were visiting:

This is the video from Nov 6 when we got back from our travels ; Jim & Jacob to South Dakota to hunt with Luci and Linda to Eugene to play Halloween with Lisa, Holly & Luke.

Sunday, October 17, 2010

Twin Trees


Our street sign is up!Jacob painted on the waterproofing for the "wine cellar"
The main stairs are now in - this is the view from the front door.
Here is the video:

Sunday, October 10, 2010

Windows and Stairs


Lots of work has been done on the house; the siding is on the dormers, most of the windows are in, there are stairs now to the bonus room and to the basement, electrical power cable has been buried and attached, and the framing of the finished basement has begun.
These are the stairs that go up to the bonus room above the garage; much more convenient than climbing a ladder!
Here's the video: